Saturday 1 April 2023

The Thunder Bay That Never Was

 

For all sad words of tongue and pen.

The saddest are these, “It might have been.”

John Greenleaf Whittier

 

As a result of its historic evolution from the twin cities of Fort William and Port Arthur, Thunder Bay has always had two former downtown cores that have been the focus of constant attempts at revitalization as well as a third commercial retail core in the former intercity area.  Three downtowns for a city of 125,000 is a lot of downtowns and yet the process of revitalization continues unabated.  The latest iterations are the recent local media stories dealing first with the downtown north core which being adjacent to the waterfront has emerged as the “entertainment” and “tourist” district.  A planned reconstruction of the downtown street here to emphasize walkability at a total of $13.2 million is now considerably above the original estimates.  And on the other side of town, there is another major streetscape project that is even more involved as it requires the complicated dismantling of the Victoriaville Mall which was placed on top of the major downtown intersection at Victoria and Syndicate.  This too will require many millions of dollars – about $11 million in one estimate - and is likely to see cost increases before we are done. 

 

The evolution of both downtowns has marked a return to more open street and pedestrian spaces that were blocked by the erection in the 1970s and early 80s by downtown street enclosing and blocking malls – Keskus on the north side and Victoriaville on the south. Keskus was finally demolished in 1999 to make way for downtown development centered on the arrival of the OLG Thunder Bay Charity Casino.  The result has been a more vibrant downtown area of shops and restaurants.  There is a similar expectation of this happening in the south side after the removal of Victoriaville Mall.  In the end, both downtowns along with the intercity area have evolved to some extent in a manner remarkably similar to the paths outlined in several Chronicle Journal newspaper articles and opeds authored in the late 1980s and early 1990s (CJ “Assign each city core its own specializations, Weds. July 26, 1989; CJ City at a Crossroads Series, November 16, 17 & 24, 1990).  That is “core specialization” with the north side downtown a “tourism-commercial” area given the presence of the harbour and waterfront, the south side downtown an “administrative-commercial” area given the concentration of city government there and intercity area as “commercial-industrial”. 

 

With some exceptions this is somewhat what has happened.  The former Port Arthur Downtown has a waterfront park and the arrival of the new Art Gallery will be an important addition to a critical mass of activities and functions making it a tourism and entertainment core.  The former Fort William downtown has City of Thunder Bay offices making it the administrative core.  Meanwhile, intercity has become the choice for new retail development.  At the same time, there is a lot of inconsistency given that the community auditorium is in the intercity area rather than in a spectacular waterfront setting, there is still a substantial city office and utility presence in the Whelan building in the north core and the main arena complex – the Fort William Gardens – remains in Fort William.  And then, a plethora of public buildings – Mini Queen’s Park, a new federal building, and the public health unit as well as assorted offices – went outside the Fort William Core to off of Arthur Street, the Balmoral Area and intercity.  However, given the long-established urban pattern and historical rivalry between the two twin cities, such is the weight of history and adjustment, and change takes a long time in Thunder Bay.  And there is the reality that private developers will develop land they own to realize a return and not necessarily to implement an urban planning vision.

 

Still, change has occurred but all of this change and development pales somewhat with the anticipated urban renewal and development plans of the 1960s.  Urban renewal gripped Ontario municipalities in the 1960s and the former cities of Port Arthur and Fort William commissioned consultants coordinated by engineering firm Proctor and Redfern to put together comprehensive studies and recommendations on their downtown cores.  They were comprehensive plans for renewal of the aging cores that included general land use, streets and traffic analysis, parking, pedestrian circulation, and transit that assumed that both downtowns would retain their comparative size and strength and remain centers of activity.  The Port Arthur Report was delivered in February of 1968 and the Fort William Report in April of 1969.  

 


 

 

The before and after illustrations are quite dramatic.  Port Arthur has plans for a dramatic waterfront park and civic centre and plaza, plans for streetscaping and a new senior complex.  Fort William’s downtown plan was even more ambitious with apartment blocks along Vickers Street, a new civic complex and riverfront park adjacent to the current city hall. The removal of the tracks along the Kam River was shown with a new thoroughfare and a set of high-rise riverfront dwellings along a park and boardwalk.  As for shopping, a new retail mall on land off of May Street to be called the Kam Center was proposed. As the accompanying illustrations show, the downtowns especially in Fort William were to be higher density areas and pedestrian intensive.  In many respects, the downtown areas would be “15 minute” cities with many services within walking distance of where people lived.

 


 


 

 

 


Alas, the reports presented an urban downtown picture that did not come to pass for a variety of reasons.  First, they of course were made immediately obsolete by the Amalgamation that fused the two cities together and the resulting politics created new initiatives that included two downtown malls as part of core revitalization.  Second, the plans failed to anticipate and realize the rise of the intercity area which after Amalgamation meant it was poised to be readily developed as the choice location given it was between the two population clusters.  Third, the 1970s much like the rest of the country saw a suburban housing boom that led to car intensive sprawl rather than infill in the downtown cores.  And finally, there was a massive overestimate of where Thunder Bay’s population was going given that the proposals assumed rather robust population growth for the Lakehead area that by 1986 was forecast under various assumptions to range anywhere from about 150,000 to 175,000.  Indeed, under such assumptions, Thunder Bay today would be well over 200,000 but such growth was not supported by the future evolution of either the city’s economy or its demographics

 

 


 

 


 

At the same time, the Port Arthur waterfront park envisioned in 1968 has in many respects come to pass though without the massive civic plaza.  And the rehabilitation of Arthur Street (now Red River Road) has occurred as well as the senior’s complex on Cumberland.  As for Fort William, the results are more disappointing in that there is no William McGillivray Boulevard skirting the Kam River and a riverfront park and boardwalk, or density high-rise housing along the riverfront or a new Civic centre adjacent to the current City Hall.  As for retail, the street blocking Victoriaville emerged in the late 1970s but not the proposed Kam Centre.  The urban reality that evolved reflected the needs and wants of the times as well as the political environment.  Still, it is fun to look back and wonder what might have been under different circumstances.  There may even be some ideas in those old plans worth exploring further.